Littlejohn Coliseum at Clemson University

Clemson University basketball fans love their Tigers, and have enjoyed watching them in the beautifully renovated Littlejohn Coliseum the last few years.   However, some of the fans have been a little too exuberant.  Fans would climb up and stand on, or sometimes even jump on the metal railing that protected them from tumbling down into the lower sections.   The railing was bending and sometimes popping loose from the support posts during games, causing a hazard for the fans.

Littlejohn Coliseum Damaged railing 1

Damaged metal railing at Littlejohn Coliseum

Littlejohn Coliseum Damaged railing 2

Some of the railing was unattached at the end

The University turned to Harbin Lumber’s Installed Services team to help them get the 9,000-seat multi-purpose arena in South Carolina back in top condition during the off-season.

Littlejohn Coliseum Harbin Installed Services team Chris

Harbin Lumber’s Installed Services’ Chris works on cutting away the damaged railing

 

Littlejohn Coliseum Harbin Installed Services team Chris and Eddie

Harbin Lumber Installed Services team works to remove the old railing

Harbin’s Installed Services team disassembled and removed the damaged old railing. Next, they installed 11,000 lineal feet of stainless steel cable railing from Atlantis Cable Rail.

 

Close up view of new cable rail

 

Finsihed cable rail at Littlejohn Coliseum Harbin Installed Services

New cable railing provides a sturdier barrier for viewing the game in safety

 

The new cable is designed to have some flexibility while maintaining strength and integrity to provide protection from falls.

Installation is now complete, and the arena is all set for the next season to begin.  No matter what college team you cheer for, we are happy to help see that Clemson fans can now cheer safely for their Clemson Tigers.